Project Information
TIME
Ongoing
LOCATION
Campbell River, British Columbia, Canada
NUMBERS
2.1-km tunnel
PRODUCTS
O-Pile® 40-674
Interesting Facts
The Challenge
Construct a temporary cofferdam in a sensitive marine and drinking water environment, requiring drilling and socketing into bedrock while ensuring minimal environmental impact.
For Contractors
FRPD, working alongside a joint venture between Aecon/SNC-Lavalin Constructors, successfully installed the O-Pile® 40-674 system. The piles were drilled and socketed 4–5 m into rock, and a double silt curtain was used to protect water quality.
For Engineers
Engineers selected O-Pile® 40-674 for its ability to be efficiently drilled into bedrock while maintaining watertightness for cofferdam construction. The solution also accommodated the complex hydraulic and geological conditions of the site.
For Owners
The John Hart Generating Station Replacement Project ensures a modernized, reliable power supply for the region. By minimizing environmental impact and securing the city’s drinking water, the new facilities will serve the community’s needs for decades to come.



